01 A bridge that leads to no road
It is called Cyklomost slobody and it opened on 22 September 2012. It joins the district of Devínska Nová Ves, at the far north-western edge of the municipality, with the Austrian bank of the river Morava. It is around five hundred metres long, open all year, and only bicycles and pedestrians may use it.
That last condition is what sets it apart from any other border crossing. There is no vehicle lane, no service area and it does not feed into a road: it leaves a paved path between trees and arrives at another paved path between trees. The speed at which you cross is set by the bicycle, and that changes the experience of moving from one country to another completely.

02 The piers that were already there
The detail that turns this into a story rather than just infrastructure is underneath. The bridge was built on the same site as another put up in the eighteenth century, in Maria Theresa's time, and some of those piers are still in the water. That is: the crossing existed, was lost, and has been recovered two and a half centuries later, for a kind of traffic that did not exist back then.

From up there you also understand why this bank is so empty. The Morava spills regularly across a wide, low floodplain, and that has kept the land unbuilt on both sides. You cross half a kilometre of wetland before touching firm ground in the other country.
The crossing existed in the eighteenth century, was lost, and has been recovered for traffic that did not exist then.
03 What is on the other side
The bridge does not lead to a village or a station: it leads to Schloss Hof, an Austrian baroque palace with terraced gardens dropping toward the river. It is a destination in its own right, with its own hours and admission, and that is why the footbridge was built where it was.

It is worth knowing before you set out, because it shapes the planning: the bridge is open 365 days a year, but the palace and its gardens have a season and closing times. If your plan is to cross and visit, check the palace's calendar; if your plan is simply to cross and come back, you depend on nobody.
04 How to do it without fuss
Devínska Nová Ves is at the far north-western edge of the city and has its own railway station, plus city buses. From there the cycle path reaches the bridge through a flat, traffic-free riverside strip. If you cycle from the centre the ride is long but entirely flat: you simply follow the bank.
Two practical warnings. First: do not count on public transport on the far side, because the Austrian bank is open countryside; whatever you cross pedalling you will have to cross back. Second: although there is no check and no formality, you are still changing country, so carry your identity documents as on any international trip.
And a recommendation on how to take it. This is not a viewpoint or an attraction: it is a piece of ordinary infrastructure doing something not at all ordinary. The point lies precisely in how unremarkable the act is —pedalling five hundred metres over a wetland and coming out the other end— and in realising halfway across what you are doing.
Explore this destination
Discover its points of interest, prices, access and everything worth seeing.
Days already sorted
Day-by-day routes for this destination, with stops, timings and what each one costs.




